Why the lower bid is often a different roof
Contractors write proposals in their own words, in their own order, with their own assumptions. One bid says 'new TPO system.' The other says '60-mil TPO, 2 layers of 2.6 inch polyiso, half-inch cover board, fully adhered, 24-gauge edge metal.' Both are called a replacement, and they are not the same product.
The difference shows up in the total first and in the roof ten years later. A thinner insulation package, a mechanically attached membrane where an adhered one was expected or a skipped cover board all cut cost. None of them is wrong in every case. The problem is when you cannot see the cut because it was never written down.
So do not compare totals. Compare scopes. Make a single table with one column per bidder and one row per item below, then fill every cell from the paper, not from what the salesperson said in the parking lot. Where a cell is blank, call and get the answer in writing before you rank anything.
The rows every bid comparison needs
Copy these into a spreadsheet and fill them in for each proposal. Any row you cannot fill is a question for the contractor.
- Tear-off scope: full removal to deck, partial removal or recover, and who handles disposal
- Membrane type, thickness and color, such as 60-mil or 80-mil TPO, 0.060 inch PVC or 45-mil EPDM
- Insulation material, number of layers, total thickness and the resulting R-value
- Cover board type and thickness, or a clear statement that none is included
- Attachment method: fully adhered, mechanically attached or ballasted
- Edge metal and coping: gauge, profile, finish and whether it is built to ANSI/SPRI ES-1
- Flashing scope: curbs, pipes, walls, scuppers, drains and the roof hatch
- Tapered insulation or crickets, with a drawing or a note on where they go
- Warranty type, length, who issues it and what it excludes
- Allowances and unit prices for wet insulation, deck repair and added blocking
- Permit, crane, dumpster, safety and temporary protection responsibilities
- Schedule, working hours, tenant notice and how weather delays are handled
Insulation, attachment and edge metal side by side
These three rows move the price and the performance more than any others. Use the ranges as general planning figures for Middle Tennessee, since site conditions, height and access change them, and we quote after a site visit.
| Item | Lower-cost version | Heavier-duty version |
|---|---|---|
| Insulation | One layer of polyiso at 2 to 2.5 inches, about R-12 to R-15 | Two staggered layers at 4 to 5 inches total, about R-24 to R-30 |
| Cover board | None, membrane over polyiso facer | Half-inch high-density board that resists hail and foot traffic |
| Attachment | Mechanically attached with fasteners and plates in rows | Fully adhered over cover board, fewer penetrations in the deck |
| Edge metal | Light-gauge drip edge, standard finish | 24-gauge or heavier coping and fascia tested to ANSI/SPRI ES-1 |
| Typical installed range | $7.60 to $10.90 per sq ft | $10.45 to $15.30 per sq ft |
Insulation: thickness and R-value are not the same line
Bids often state thickness, 'two inches,' and leave R-value out. Polyiso rated around R-5.7 per inch on paper loses some of that value in cold weather and over time, so a thin board and a thick board are not close. Ask for the total number of layers, the total thickness and the R-value the contractor is basing it on.
Energy codes can require added insulation when a roof is replaced, and the requirement depends on the jurisdiction. Metro Nashville Codes covers permits in Davidson County, and other counties and cities have their own offices. A bid that quietly drops below the required thickness may price lower today and fail plan review tomorrow.
Thicker insulation raises the roof edge and the height of every curb, wall flashing and door threshold. Check that each bid accounts for that. A proposal that adds four inches of foam but keeps the old flashing heights has left work out, and the change order shows up after the tear-off.
Attachment and edge metal decide wind performance
A fully adhered membrane over a cover board behaves differently in a wind event than a mechanically attached sheet with fasteners every few feet. Neither is automatically better for every building, but they cost differently and carry different warranty conditions. Make sure both bids describe the same method, or accept that you are choosing between two methods rather than two prices.
Edge metal is where wind starts lifting a roof. The perimeter takes the worst uplift, and the Middle Tennessee record of straight-line wind and tornado damage, including the March 2020 and December 2023 storms, is a good reason to read this line closely. Ask for gauge, profile, finish, cleat type and whether the system is tested to ANSI/SPRI ES-1.
A bid that says 'edge metal per manufacturer' is not a spec. The manufacturer's warranty may require a certain edge detail for a given wind speed, and the contractor should write it down. If one bid prices a heavy coping and the other prices a thin drip edge, the second one is not cheaper, it is a different roof edge.
Wet insulation allowances and unit prices for change orders
No one knows how much insulation is wet until the old membrane comes off, unless a moisture survey and cores were done first. That is why good bids include an allowance and unit prices. An allowance is a set number of square feet of insulation replacement already included in the base price. A unit price is the cost per square foot for any quantity above it.
Compare the allowance quantity first. A bid that assumes zero wet insulation will look lowest and then grow. A bid that assumes eight percent of the roof is wet, based on a survey, is more honest. Then compare unit prices. Wet insulation replacement might run $3.40 to $6.10 per sq ft and deck repair $2.85 to $5.70 per sq ft, depending on deck type, thickness and access.
Ask both contractors to price the same extras in the same units: wet insulation per sq ft, steel deck patching per sq ft or per sheet, plywood replacement per sheet, added blocking per linear foot, and crickets per each. With those numbers you can run a simple test, adding the cost of a ten percent overrun to each total and seeing whether the ranking changes.
Exclusions that quietly move the price
The exclusions paragraph is usually the shortest part of a bid and the most expensive if you skim it.
Rooftop unit lifting
Lifting and resetting HVAC units for curb work may be excluded, leaving you to hire a mechanical contractor.
Lightning protection and solar
Removing and reinstalling rooftop systems is often excluded and priced as a separate trade.
Deck repair beyond the allowance
Everything past the stated quantity becomes a change order at whatever price the contractor names then.
Interior protection
Ceiling tiles, dust barriers and tenant relocation are usually the owner's problem unless the bid says otherwise.
Permits and inspections
Some bids exclude permit fees or the cost of a third-party inspection, which can surprise a tight budget.
Warranty fees and extras
A longer warranty may carry a fee or require upgrades that were not in the base price.
Warranty type matters more than warranty length
A twenty-year label tells you little until you know what it covers.
| Question | Manufacturer NDL warranty | Contractor workmanship warranty |
|---|---|---|
| Who stands behind it | The membrane manufacturer, when the system and installer qualify | The roofing contractor alone |
| What it covers | Membrane and flashing defects, with limits on labor and consequential damage | Installation errors such as bad seams or flashing |
| Common exclusions | Ponding water, storm damage, foot traffic, rooftop equipment work | Weather events, other trades, lack of maintenance |
| What to ask | Read the sample document, not just the brochure, and confirm the insulation and edge metal it requires | How long the workmanship coverage runs, and the written process for a leak call |